Camp Lemonnier 2015

Baraka Sport was retained to assist CNIC and NAVFAC in removal of a failed turf field and reconstructing the base to have a crown and loosen up the overly compacted sand to assist in drainage. Baraka Sport was also retained to oversee the installation of the new synthetic turf field which was laden with issues from poor logistical planning to lack of expertise. A copy of the NAVFAC summary post construction is attached.